The terminal
The terminal is linked to the Estonian Railway via the Ülemiste station. The railway tank wagon handling facilities allow the simultaneous unloading of 9 RTCs of light product. Truck unloading places: 4 places for dark products and 5 places for light products. Truck loading places: 2 for light and 3 for dark products.
Jetty nr 35
Maximum vessel’s draft permitted alongside: |
8,8 m |
Pier length: |
400 m |